Skip to content
Nunes TilingNunes Tiling

Why we cost more.

It is a fair question and it deserves a specific answer rather than the word “quality”. Here is exactly what is inside our price, and what a cheaper quote is leaving out to get under it.

01

The substrate is corrected, not covered

We check every wall to plane and every floor for fall before anything is fixed, with a straight edge and a level rather than by eye. On an architectural build the tolerance you were promised and the tolerance you actually have are rarely the same number: framing moves, sheets go up in a different week by a different trade, and a slab poured flat six months ago has lived through a winter since. Correcting that is usually a full day that does not appear on a cheaper quote — which is precisely why that quote is cheaper. It is also the step that decides how the room looks in five years rather than five weeks, because a large format tile cannot follow a wall that is out of plane. The error has to go somewhere, and where it goes is a grout line that opens up, a shadow along the top of the wall, or the hollow you can hear under your foot.

02

Falls are formed in the screed

Water reaches the waste because the floor is shaped to send it there, not because the adhesive bed was thickened on one side. The screed is set out with a laser level, so the fall is a measured number held right across the floor and not an eye. That matters most where the drawings ask for something difficult — a hobless shower, a linear drain against one wall, a floor that has to run level through the doorway and still drain inside the enclosure. Fall built in adhesive fails twice over: the bed ends up inconsistent in thickness, which is where hollows and cracks start, and the surface ends up with a shallow dish that holds water in one corner. A shower that never quite dries was built the other way, and it cannot be corrected from the surface.

03

The membrane is a system with a cure date

Bond breaker at the corners, the correct upstand for that enclosure, the correct number of coats at the correct thickness — and then a full cure before anything covers it. Each of those is in AS/NZS 3740 for a reason: corners move, so a membrane bonded hard into them tears at exactly the point water is sitting; the upstand is what stops water leaving where it is most likely to; and a coat applied over one that has not cured is a single weak film instead of two. The cure is where money is actually saved on a cheap job, because it is a day on site where nothing visible happens — so the floor gets covered that afternoon, and nobody can tell until the ceiling below it stains. We price that day as the day it is. Primer, membrane, adhesive and grout also have to be one manufacturer's system for any of it to be backed, which is why we do not mix brands.

How the installation system works

04

Full adhesive coverage, every tile

Correct notch for the format, the trowel worked in one direction so the ribs collapse and close instead of trapping air, and the tile back-buttered where the format or the material demands it. A void under a tile is not a cosmetic issue. It is where a crack starts the first time something heavy is dropped, it is the hollow note you hear walking a floor, and in a wet area it is a space that fills with water and never dries out. Natural stone is less forgiving again: a void under a pale or translucent stone reads through the face as a shadow, so the bed has to be solid for appearance as much as for strength. Coverage is also the one part of the job that becomes invisible the moment the tile goes down — which is exactly why it is worth asking about before it does.

05

Movement joints go in where the standard puts them

Perimeter joints and internal corners to AS 3958.1, and intermediate joints in a field large enough to need them. They are a visible line, and they are not decoration: tile, adhesive, screed and the structure behind them all move at different rates, and a field with nowhere to move puts that load into the weakest thing available. So it tents off the floor, or it cracks along a line nobody chose. Underfloor heating and a wall of glass facing the sun both make it worse, which describes a good share of what gets built here. If you would rather not see the joints, tell us at the drawings stage: where they land is something set-out can often solve, and a joint in a doorway, under a cabinet line or against a change of material is one you stop noticing. Whether they exist is not something we will negotiate.

06

Set-out is decided before anything is cut

We plan the grid around the sightline from the door, the centre of the vanity, the run under the rangehood and the line a niche or a step has to meet. Full tiles where the eye lands, cuts where it does not, and the grid carried through thresholds so a floor reads as one floor instead of three rooms that happen to share a tile. In natural stone the same thinking has to be done for tone as well as line: stone varies box to box, so a floor running through a whole house is sorted across the whole house at once, before the first piece goes down — not room by room as each box is opened. Set-out costs thinking time rather than material, and it is most of what separates a good job from an expensive one. It is also the one decision you cannot revisit: once the wall is cut, the only way to change the grid is to take it off.

The standards we build to

Not marketing language — these are the documents that define what a compliant wet area actually is. Ask any tiler you are considering which ones they work to.

NZBC E3/AS1

Internal Moisture

The Building Code clause that governs wet areas. It sets where the surface has to stop water and where the water has to go.

AS/NZS 3740

Waterproofing of domestic wet areas

How the membrane is built: how far up the wall, how the corners are bonded, how the fall to the waste is formed.

AS 3958.1

Installation of ceramic tiles

Substrate tolerance, adhesive coverage and — the one most jobs skip — movement joints.

Qualified, and accountable to the trade

Tiling is not a restricted trade in New Zealand. Anyone may quote your bathroom tomorrow, which is why it is worth asking who assessed them and who they answer to.

BCITO

Trade qualified

Our director, Gustavo Nunes, is trade qualified through the Building and Construction Industry Training Organisation — the body that sets and assesses the trade standard in New Zealand. It is an assessed qualification, not a course certificate, and most of the assessment is done on real sites, on real work.

TANZ

Tile Association of New Zealand

Gustavo is a member. It is how the trade keeps its standards current: changes to the Building Code, to waterproofing practice and to what the manufacturers will stand behind do not arrive by accident.

10 years

Ten years on our workmanship

Where we install the complete system — preparation, waterproofing, adhesive and grout — the warranty covers the whole of it. Where we tile over someone else's waterproofing, it covers our tiling and nothing more, because our tiling is all we can stand behind. That is the real reason we ask to do the whole system, and not a preference.

Silicone and sealers are maintenance items: they wear with use, cleaning and building movement. They are covered for twelve months, and replaced as maintenance after that.

Questions worth asking any tiler

Can you tile over waterproofing that someone else has already done?
We can, and we are asked to. What changes is what we are able to stand behind: where we install the complete system, the ten-year workmanship warranty covers the whole of it, and where we tile over another trade's membrane it covers our tiling and nothing more, because our tiling is all we can answer for. You will be told which of the two you are buying before we start, in writing. That is the real reason we ask to do the whole system, and not a preference.
Does a tiler have to be licensed in New Zealand?
No. Tiling is not a restricted trade here, so anyone may quote your bathroom tomorrow and there is no register to check them against. Waterproofing a wet area is still building work that has to comply with the Building Code, which is the gap worth knowing about: the standard is compulsory, the qualification is not. It is why it is worth asking who assessed the person doing the work, and which association they answer to.
How long does waterproofing have to cure before tiling starts?
As long as the manufacturer's data sheet says for that product, in the conditions of the day — temperature and humidity both change it, and a cold Central Otago morning is not a laboratory. We work to the data sheet rather than to the programme, and the wait is built into the dates we give you instead of being discovered on the day. If a programme cannot absorb that wait, we are the wrong installer for it, and we would rather say so at the start than take the shortcut later.
Our specification names a different manufacturer. Can you work to it?
Tell us at the drawings stage. We install one manufacturer's system end to end and we do not mix components between brands, because mixing is where responsibility for a failure disappears. We will put the technical case for ours, with the data behind it and the manufacturer's technical team available to answer the specifier directly. If the specification cannot change, we are not the right installer for that project — and over the drawings is a far better place to find that out than on site.
Is a cheaper quote always cutting corners?
Not always. Sometimes it is a smaller scope, a simpler tile, or a tiler who genuinely wants the work. But the six steps above are where the hours are, and all six are invisible in a finished room, so they are the first things to come out of a price that has to get under someone else's. If you are comparing quotes, ask each one in writing who corrects the substrate, how the fall is formed, what has to cure and for how long, and where the movement joints go. The answers separate the quotes more than the totals do.

When we are the wrong choice

If the budget is fixed and tight, or the timeline cannot absorb a membrane cure, we are genuinely not your best option — and we would rather tell you now than halfway through. A rental turnaround or a straightforward re-grout does not need what we charge for.

Where we earn our price is the job you intend to keep: your own bathroom, a stone floor, a large format wall, anything where a failure means opening the room back up.

If what you want next is the other half of this — not what we do, but what makes one room cost twice another the same size — that is set out in the pricing guide.

Discuss your project